Before production
The team checks drawing status, dimensions, material callouts, samples, color references, hardware, electrical inputs and packaging requirements.

Inspection points follow the approved specification instead of relying on a final visual check alone.
Request a Project ReviewThe team checks drawing status, dimensions, material callouts, samples, color references, hardware, electrical inputs and packaging requirements.
Inspection records are selected according to project risk.
The quotation and quality plan define which samples, photos, inspection records or third-party checks are included.
An inspection record is useful when it identifies the fixture, drawing revision, check method and outcome. Agree which checks are universal, which are sampled and which require specialist evidence before production starts.
| Decision | Buyer input | Confirm before approval |
|---|---|---|
| Basis | Approved drawing, sample, finish and order quantity | Inspector checks the same revision used for production |
| Method | Dimension, appearance, function, assembly or component evidence | State tools, conditions and sample coverage |
| Findings | Fixture reference, photo, location and defect description | Open, corrected, rechecked or accepted deviation status |
| Release | Outstanding issues and acceptance authority | Written decision before packing or shipment |
Content updated 2026-10-25. Project specifications and commercial terms remain subject to the agreed drawings and quotation.
Send five essential details. We will identify the drawings and commercial information needed for a project quotation.